Estimating
More services
Estimating is carried out by
R B Plant both in the preparation of
competitive t enders and the preparation of budgets for
clients to present sanction applications to the required
degrees of accuracy.
The estimating is led by
the Project Engineer with input from the various
discipline engineers involved. The preparation of budget
costs is often carried out as part of a feasibility, front
end or pre-project study. However, on occasions we are
employed solely to prepare sanction application values
against a set of conditions where the assumptions,
exclusions, unknown and risk areas are all outlined.
Estimating involves the
provision of man hour estimates as well as for
construction costs.
The estimates are
presented in the form of a summary sheet with a full set
of breakdown sheets in support. The costs are presented on
Microsoft Excel spreadsheets or on different formats to
suit the client. Furthermore the philosophy adopted in the
preparation of the estimate is also spelt out. The
costings provide details of the field costs as well as on
costs such as CDM, QS’s, Engineering, HAZOP’s, Spares,
Commissioning and Validation, Contingencies (based on the
design status, information provided and site conditions)
and Escalation. The field costs are usually obtained from
quotations against specifications whilst the on costs are
obtained from the skills of the Project Engineers and the
company’s in depth experience.
The experience available
within our organisation as contractors and our
relationship with suppliers and sub-contractors gives us a
distinct advantage in the ability to prepare rapid and
realistic estimates which can be taken forward with
confidence by the client. |