More Case Studies
Pfizer Ltd Sandwich, recently used R B Plant Group’s multi-discipline
Design and Management skills for an
antibiotic fermentation facility
expansion.
The validated project, completed on time and within budget, required the
existing piled foundations to be verified as suitable for the new batch
fermenter and ancillaries. After quantitative methods proved inconclusive a
regime of static load testing was conducted to ensure minimal pile
deflection.
"R B Plant has been engaged to engineer and manager a number of
multi-disciplined projects in our fermentation plant. Working closely on
site with the client, and with the full engineering and management support
of their head office, they have achieved project completion dates".
"They have demonstrated their ability to schedule work around "live"
production plant and to achieve tight plant shutdown objectives, whilst
still demonstrating flexibility".
"At a time of very high activity on the Sandwich site, R B Plant has been
of great value in augmenting our engineering effort".
"We envisage a long standing relationship, building on the results
achieved so far".
Production Engineering Manager, Pfizer Limited, Sandwich.